Metodologia de Programação Não Linear Inteira Mista para Planeamento Hídrico de Curto Prazo (Mixed-Integer Nonlinear Programming Approach for Short-Term Hydro Scheduling)

J. P. S. Catalão (catalao@ubi.pt)1, H. M. I. Pousinho (hmi-21@hotmail.com)1, V. M. F. Mendes (vfmendes@isel.pt)2


1Universidade da Beira Interior
2Instituto Superior de Engenharia de Lisboa

This paper appears in: Revista IEEE América Latina

Publication Date: Dec. 2010
Volume: 8,   Issue: 6 
ISSN: 1548-0992


Abstract:
This paper is on the problem of short-term hydro scheduling, particularly concerning a head-sensitive hydro chain. A novel mixed-integer nonlinear programming approach is proposed for optimizing power generation efficiency. The proposed approach considers not only the nonlinear dependence between power generation, water discharge and head, but also start-up costs for the hydro units and discontinuous operating regions, in order to obtain more realistic and feasible results. Numerical results based on one of the main Portuguese cascaded hydro systems illustrate the proficiency of the proposed approach.

Index Terms:
Hydro scheduling, mixed-integer nonlinear programming, head change effect   


Documents that cite this document
This function is not implemented yet.


[PDF Full-Text (381)]