Subcommittee F - Field Testing and Diagnostics


Chairmen:

Scope:

The subcommittee considers all issues related to testing and diagnostics of cables and cable systems.  

Mission Statement:

 The Field Testing and Diagnostics Subcommittee’s mission is to continually advance the understanding of field testing and diagnostics through discussion, and to provide a forum for preparation, and maintenance of standards on field testing and diagnostics of new and service-aged cables and cable systems.

Discussion / Working Groups:

Group
No.

Group
Typex

Group Name

Chairmen

F01 (C16) W (P400) Guide for Field Testing and Evaluation of Shielded Cables.IEEE 400 (Omnibus) Wen/Côté
F02 (C17) D Guide for DC Field Testing - IEEE 400.1 Larzelere/Buchholz
F03 (C18) D Very Low Frequency Testing in the Field – IEEE 400.2 Densley/Schlesinger
F04 (C19) D Partial Discharge Testing in the Field – IEEE 400.3 Mashikian/Boone
F05 (C Ad Hoc) D Damped AC Voltage Testing Gulski
F06 (C Ad Hoc) D DC Field Testing of Extruded Cable Systems) Buchholz/Patterson
F07 (C14) D Revision of IEEE 82 – Impulse Testing Buchholz
F08 (A13) D Water Tank Test Procedures Densley/Walton
F09 (A6) D Accelerated Electrical Aging Walton/Sarma
F10 (C15) Inactive DC Field Testing – IEEE 400 (reaffirmation)  

xW = Working Group (Prepares a document such as a standard, guide or paper) D = Discussion Group (Provides a forum for discussion on a focused topic.)  Working groups have the PAR # in parenthesis.

Minutes

Return to the ICC Subcommittee page

This page last revised on 08/19/08