Reclosers and Other Distribution Equipment Subcommittee


Scope:

Treatment of all matters relating to distribution switching and overcurrent protective equipment, including reclosers, sectionalizers, fault interrupters, capacitor switches, pad-mounted gear, and submersible gear; except for high voltage fuses and high voltage overhead air switches.


Chairman: Steve Meiners
General Electric

41 Woodford Avenue
Plainfield, CT 06062



 

Standards Covered by this Subcommittee:

C37.60

-2003

IEEE Standard Requirements for Overhead, Pad Mounted, Dry Vault, and Submersible Automatic Circuit Reclosers and Fault Interrupters for AC Systems

Chairmen:

Bob Behl &

Dave Stone

C37.63

-2005

IEEE Standard Requirements for Overhead, Pad-Mounted, Dry-Vault, and Submersible Automatic Line Sectionalizers for AC Systems

Chairman:

Marcel Fortin

C37.66

-2005

Requirements for Oil-Filled Capacitor Switches for Alternating-Current Systems

Chairman:

Harry Hirz

C37.74

-2003

Standard Requirements for Subsurface, Vault, and Padmounted Load-Interrupter Switchgear and Fused Load-Interrupter Switchgear for Alternating Current Systems up to 38 kV

Chairman:

Steve Meiners

 


 

Current Rode Subcommittee Activities:

 

Controls for Distribution Equipment Task Force

Chairman: Donald M. Parker

There are voids in existing standards regarding special requirements associated with the application of controls on distribution lines (outside the substation).  The purpose of this task force is to identify these special requirements and define the necessary testing.  Some examples of these requirements are: (1) temperature, humidity, frost, (2) mechanical vibration, (3) harmonics, (4) grounding variations, (5) electro-magnetic interference, and (6) lightning and other surges.

 

New Solid Dielectric Equipment Task Force

Chairman: Chris Ambrose

Solid dielectric equipment is emerging technology and there is a need to analyze this equipment to determine what design tests, routine tests, and construction specifications may be needed/used.  The solid dielectric equipment will affect many standards, including C37.60, C37.63, C37.66, and C37.74.  Due to this equipment affecting many standards, the RODE Subcommittee members at the Fall 2005 meeting agreed that a RODE Subcommittee Task Force needs to be initiated to investigate this type of equipment. 

 

C37.60 – Recloser Working Group

Chairmen: Bob Behl & Dave Stone

This is a possible new working group.  Now in the formation stage. General revisions with possible new requirements for solid dielectric equipment design tests, routine tests, and construction specifications.  The solid dielectric equipment is being analyzed by a separate RODE Subcommittee task force.  The Corrigendum #1 for this standard will be incorporated into the revision.  Other changes to this standard will be solicited.

 

C37.74 – Underground Switchgear Working Group

Chairman: Steve Meiners

This is a possible new working group.  Now in the formation stage. General revisions with possible new requirements for solid dielectric equipment design tests, routine tests, and construction specifications.  The solid dielectric equipment is being analyzed by a separate RODE Subcommittee task force.  Other changes to this standard will be solicited.

 


For current information on the RODE Subcommittee please see the Minutes of the Meetings (Archives) on the Home Page.